Daytime Noise Monitoring Results -- Normal weekday            
                         
Station M8, Wah Lai House                      
Date Start Time End Time  Weather Noise level (dB(A)), 30 min Major Construction Noise Source(s) Observed Other Noise Source(s) Observed Remarks Temp. (°C) Wind Speed (m/s) Noise Meter Model / ID Calibrator Model / ID
Leq L10 L90
07-Feb-11 13:42 14:12 Fine 64 66 61 Welding Road Traffic noise from Shek Pai Wan Road and loading activties in the contraction site near Gas center N.A 18.7 <5 B&K 2238   S/N : 2684502 B&K 4231  S/N: 265616
16-Feb-11 13:36 14:06 Fine 63 65 58 Welding Road Traffic noise from Shek Pai Wan Road and loading activties in the contraction site near Gas center N.A 13.2 <5 B&K 2238   S/N : 2684502 B&K 4231  S/N: 265616
22-Feb-11 10:03 10:33 Cloudy 65 66 63 Welding, operation of excavator and drilling Road Traffic noise from Shek Pai Wan Road and loading activties in the contraction site near Gas center N.A 15.4 <5 B&K 2238   S/N : 2684502 B&K 4231  S/N: 265616
28-Feb-11 09:45 10:15 Sunny 68 70 66 Loading activities Road Traffic noise from Shek Pai Wan Road and operation of breaker in the contraction site near Gas center N.A 21.6 <5 B&K 2238   S/N : 2684502 B&K 4231  S/N: 265616
      Min. 63                
      Max. 68